Downloads provided by UsageCounts
The transmission usage cost allocation is one of the major issues experienced by the Electric Supply Industries. In this paper, authors have considered Line Outage Distribution Factor (LODF) for allocating the transmission usage cost allocation under contingency condition. Authors have modified the distribution factor for maximum flow and propose a novel Maximum Line Outage Distribution Factor (MLODF) which depends upon the redistribution of the generation in the line flow considering N-1 security constraints. Similarly, for transmission loss cost allocation under contingency condition Maximum Line Outage Loss Distribution Factor (MLOLDF) is developed. Full recovery policy of transmission cost allocation is considered. The reliability and accuracy of the proposed method is tested on the sample 6 bus system.
Transmission cost allocation, Transmission Pricing, Transmission loss cost allocation, MW-Mile method, MLODF, MLOLDF, LODF
Transmission cost allocation, Transmission Pricing, Transmission loss cost allocation, MW-Mile method, MLODF, MLOLDF, LODF
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 1 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
| views | 3 | |
| downloads | 6 |

Views provided by UsageCounts
Downloads provided by UsageCounts