Downloads provided by UsageCounts
doi: 10.3233/ica-220685
handle: 11382/549752
Nowadays the steel market is becoming ever more competitive for European steelworks, especially as far as flat steel products are concerned. As such competition determines the price products, profit can be increased only by lowering production and commercial costs. Production yield can be significantly increased through an appropriate scheduling of the semi-manufactured products among the available sub-processes, to ensure that customers’ orders are timely completed, resources are optimally exploited, and delays are minimized. Therefore, an ever-increasing attention is paid toward production optimization through efficient scheduling strategies in the scientific and industrial communities. This paper proposes a hybrid approach to improve the flexibility of production scheduling in steelworks producing flat steel products. Such approach combines three methods holding different scopes and modelling different aspects: an auction-based multi-agent system is applied to face production uncertainties, multi-objective mixed-integer linear programming is used for global optimal scheduling of resources under steady conditions, while a continuous flow model copes with long-term production scheduling. According to the obtained simulation results, the integration and combination of these three approaches allow scheduling production in a flexible way by providing the capability to adapt to different production conditions.
multi-objective mixed-integer linear programming, continuous flow model; Flat steel production scheduling; hybrid approach; multi-agent systems; multi-objective mixed-integer linear programming, multi-agent systems, continuous flow model, Hybrid approach, Flat steel production scheduling
multi-objective mixed-integer linear programming, continuous flow model; Flat steel production scheduling; hybrid approach; multi-agent systems; multi-objective mixed-integer linear programming, multi-agent systems, continuous flow model, Hybrid approach, Flat steel production scheduling
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 4 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
| views | 8 | |
| downloads | 15 |

Views provided by UsageCounts
Downloads provided by UsageCounts