
This paper assists in determining the realistic amount of power available from tidal range generation on the Solway Firth, utilising the latest turbine information for the estimates. The barrage location that is to yield the largest amount of energy output has been highlighted, standing between Workington and Abbey Head at a length of 30 km, spanning the outermost part of the estuary. Double regulated turbine models from Sulzer Escher Wyss of Zurich and also Andritz Hydro are used to determine the flow and power characteristics for individual turbines over a range of heads. Combining the up to date Andritz model with bathymetry sourced from the Department of Energy, and tidal characteristics (modelled from tidal constituents), the model for the behaviour of a barrage on the Solway for ebb generation is constructed.
330
330
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 56 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
