
Abstract The bridge of this project is a reinforced concrete structure of 1980 m divided in 40 spans. The deck is a single-cell box girder and a total width of 13 m including sidewalks and shoulders. After 25 years in marine environment, the structure showed reinforcement corrosion, especially in piles and deck bottom. It was repaired with four types of intervention: conventional reparation with patches, corrosion inhibitors, cathodic protection with sacrificial anodes and an hybrid cathodic protection system with an initial impressed current and galvanic current. In this research it is described the refurbishment and comparative results of the evolution of the repairs and therefore data of the corrosion progression and its effect in service life. The hybrid system, by the moment, is the system with the best results.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 4 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
