Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ ZENODOarrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
ZENODO
Other literature type . 2022
License: CC BY
Data sources: ZENODO
ZENODO
Project deliverable . 2022
License: CC BY
Data sources: Datacite
ZENODO
Project deliverable . 2022
License: CC BY
Data sources: Datacite
versions View all 2 versions
addClaim

Guidelines for a BIM-aided pre-deconstruction audit

Authors: Vullings, Marcel; Wijte, Simon; Huuhka, Satu;

Guidelines for a BIM-aided pre-deconstruction audit

Abstract

The BIM-aided pre-deconstruction audit process is mainly a process of collecting and digitalizing data of precast concrete elements in a donor building, from which they will be deconstructed. The digital information is stored in a database that architects and structural designers can use when designing a new building with reused precast concrete elements. The ReCreate project tests the process of harvesting and reuse of precast concrete elements in four real-life projects in Europe. The goal is to gather knowledge in a wide range of topics directly connected to the reuse of precast concrete elements in structures of new buildings. By reusing these elements, they get a second life and the environmental impact of construction a new building is significantly reduced. The insights gained in the pilot projects contribute to a kind of ‘roadmap’ for collection information on donor buildings and their precast concrete elements in what we call a ‘pre-deconstruction audit’ (as opposed to the more familiar ‘pre-demolition audit’). The audit process contains all the steps necessary to start an efficient and (structurally) safe deconstruction process of a donor building. The audit process starts by collecting data from various archives and the internet, such as Google Maps and Street View. The data is entered into a visual database, a 3D BIM model. This 3D BIM model offers great advantages in managing and validating the collected data. To validate the data, determine its reliability and complete missing data, a visual inspection is performed. Additional testing supports the data and the reliability of the data. The information obtained is incorporated into the 3D BIM model in order to create a final, complete and reliable 3D BIM database containing all the necessary information of the precast concrete elements. The roadmap for collecting the data, creating a 3D BIM model (database), verifying and managing the data of the donor building and precast elements is laid down in this document as a recommendation.

Keywords

inventory, precast concrete, deconstruction, circular construction, pre-deconstruction audit, building information modelling, pre-demolition audit, donor buildings, documentation, reuse

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
Green
Funded by