In the electricity market of today, with increasing demand for electricity production on short notice, the combined cycle power plant stands high regarding fast start-ups and efficiency. In this paper it has been shown how the dynamic start-up procedure of a combined cycle power plant can be optimized using JModelica. org, proposing a way to minimize the start-up time while maximizing the power production during start-up. The physical models have been developed in Modelica, adapted to suit optimization purposes and extended to optimization problems. Constraints keeping the lifetime consumption of critically stressed components under control are limiting factors. The plant models have been successfully optimized to full load. (Less)
Control Engineering, Combined Cycle Power Plants Start-up Dynamic optimization Optimica Control Modelica Modeling
Control Engineering, Combined Cycle Power Plants Start-up Dynamic optimization Optimica Control Modelica Modeling
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 2 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |