
In November 2017, a salvage excavation was conducted at H orbat Endor (Permit No. A-8146; map ref. 236108/727261; Fig. 1), prior to works on the Dovrat–Newe Ur gas line. The excavation, on behalf of the Israel Antiquities Authority and funded by Israel Natural Gas Lines Ltd., was directed by Y. Har’el (field photography), assisted by Y. Lavan (administration), Y. Shmidov (surveying and drafting), N. Feig (pottery), A. Shapiro (tobacco pipes), H. Tahan-Rosen (pottery drawing and plans) and J. Gosker (seal ring).
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
