
The installation of the present wind farms Hywind Scotland and Hywind Tampen are both carried out by towing the fully assembled wind turbine from the assembly site in the Norwegian fjords to the final offshore site. In the present study an alternative installation method is proposed where the fully assembled tower is transported to the site on the installation vessel and mounted onto the preinstalled floating substructure (a spar buoy). The paper presents a brief outline of the design process for the proposed concept and gives an overview of the work done to evaluate variations of the installation vessel and the proposed lifting mechanism. The paper is a summary of the results obtained by a project team in SFI MOVE addressing marine operations related to installation of floating offshore wind turbines.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 2 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
