
We present hydrological and economic modeling of a dam 40 km south of Cairns at an altitude of 620 m. The key is a relatively large dam wall and a small but deep 40 GL lake in a catchment area that receives 6–10 m of precipitation annually (120–160 GL run off). This would secure all current and future water needs for Cairns. The lake would be coupled by a vertical shaft to a 250 MW (peak) hydro-power station 500 m below and inside the mountain. From there, a 6 km tunnel running east connects with the coastal dam service-tunnel and a 3 km tunnel running west takes the water back to the river below the falls. On average this would result in the release of 300 ML/d opening up opportunities for tourism, new industries, and irrigated farming of high yield crops. The tunnel offers the possibility of a new transport corridor from the Coast to Atherton on the central tablelands. The increased flows in the dry season could be important for the health of the river which is also a nursery-ground for the Great Barrie...
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 1 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
