
doi: 10.4043/28803-ms
The Hebron platform was successfully installed on the Grand Banks (Offshore Newfoundland and Labrador) in June 2017 with first oil produced in November 2017. It consists of a single shaft concrete Gravity Based Structure (GBS) supporting an integrated drilling and production topsides. The design of the platform was challenged by sub-arctic and extreme metocean conditions which required innovative design and layout approaches for many elements considered routine for typical platforms. This paper highlights the underlying innovative technologies, analytical and design methods as well as the capital-efficient execution strategies employed.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 5 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |
