
In order to advance the instruction of the Smart Grid, resolve the peak regulation problem brought by new resources connected to the grid, and change the situation that hydropower peak regulationis regulated freely, analyzing the component of the hydropower peak regulation and indicating that the cost is mainly the opportunity cost which is produced by the change of water consumption rate in the process of regulation. By analyzing problems in our present hydropower peak regulationtrading mechanism, indicating the necessary of building hydropower peak regulation market in China, Based on the peak regulation right, proposing the building rules, option methods and pricing methods of the hydropower peak regulation market which is adapted to the present situation in our country. Example shows that building a hydropower peak regulation market can bring reasonable income for hydropower generating units, and then effectively improves the positivity for hydropower generating units to regulate, resolves peak regulation in the smart grid, improves ratio of energy utilization and realizing optimal allocation in resource.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
