This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW).
Design, Hanford Reservation, 052000, Waste Management, Power Transmission Lines And Cables, Radioactive Waste Disposal 240300, Power Substations, Power Transmission Lines, 12 Management Of Radioactive And Non-Radioactive Wastes From Nuclear Facilities, 24 Power Transmission And Distribution, Radioactive Waste Facilities, Radioactive Waste Processing
Design, Hanford Reservation, 052000, Waste Management, Power Transmission Lines And Cables, Radioactive Waste Disposal 240300, Power Substations, Power Transmission Lines, 12 Management Of Radioactive And Non-Radioactive Wastes From Nuclear Facilities, 24 Power Transmission And Distribution, Radioactive Waste Facilities, Radioactive Waste Processing
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |