doi: 10.2118/10402-ms , 10.2523/10402-ms
Abstract The Frigg Field Transportation System was commissioned in 1977. Since starting production, Total Oil Marine has initiated and maintained an in service inspection programme designed to identify any condition of the line which may lead to failure of the line either in the short or long term. Until 1980, the main problems on the pipeline were identified as short term stability problems. We believe that our current inspection programme is adequate to identify rapidly any area of concern. In 1981 our main effort is to determine the best methods for identifying longer term problems such as internal and external corrosion. Our current programme therefore now has three main aspects. The external inspection, performed routinely over the past four years, cathodic protection inspection tested in 1980, and an internal pigging programme which was initiated in 1978. The full inspection programme will be the subject of this paper.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |