
In this paper we present a new algorithm to find the optimal unit commitment and economic dispatch (UC/D) for a large hydrothermal power system. Mathematically, this is a large nonlinear, mixed integer optimization problem involving over 16,800 integer variables for a system having 100 thermal units with a 1-week scheduling horizon. We use a dual programming approach to solve a separate optimal control problem for each thermal unit and for each set of coupled hydro units. The algorithm has been tested on a 100 thermal unit/6 hydro unit system having a 168-hour scheduling period, and will find solutions that are within 0.1 to 0.25 percent of the optimal dual cost. We report computational results for a system modeled after the New York Power Pool.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 52 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 1% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
