
The International Electro-technical Commission through the 61499 standard establishes the basic infrastructure towards an open market in the control and automation domain. This standard can be considered as the first step towards the development of the next generation agile manufacturing systems where distribution, interoperability and re-configuration are between the most important requirements. However, even though many researchers are working during last years towards this direction, the understanding of the use of the IEC 61499 between practitioners is weak. The standard has many open issues regarding the design views that are required for an effective design process for distributed control systems. In this paper, the inefficiencies of IEC 61499, at least as far as the design phase is considered, are highlighted and the way that these inefficiencies can be addressed is discussed. A laboratory system, the FESTO modular production system, is used as a running example to demonstrate possible design alternatives.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 11 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |
