
doi: 10.1063/1.2800524
An 84‐GHz electron cyclotron heating (ECH) system is being installed on the KSTAR tokamak. KSTAR adopts ECH‐assisted start‐up for the flexibility and reliability of the KSTAR operation with the plasma breakdown voltage reduced. The available maximum power of the 84 GHz ECH system is presently 500 kW with maximum duration of 2 s. Currently, the second harmonic ECH‐assisted start‐up is under consideration because a low toroidal field of BT∼1.5 T is desirable for safety and also for the high‐beta experiments in the initial operation phase. The studies in this paper are on the effectiveness of the second harmonic breakdown using a 0‐D time dependent plasma evolution code and the comparison with the recent DIII‐D experimental results on the second harmonic pre‐ionization
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 1 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
