
AbstractIn the process of industrial corporation activities a lot of waste, which pollutes the atmosphere, is generated, for example ash and slag. In Tomsk region, by estimates, ash stores occupy about 600 hectares, which contain about 25 million tons by weight. In Russian thermal power-stations ash disposal areas there are about 1.3 billion tons of ash, and only 10% of it is used. That is why this problem is topical enough. In this paper the scheme of producing ash ceramic bricks and complex ash and slag waste processing is shown. Besides, profitability of the project is presented.
Chemistry(all), ashstore, вторичное сырье, ash, Ash, шлаки, золошлаковые отходы, безотходные производства, slag, investment project., investment project, Chemical Engineering(all), инвестиционные проекты, waste-free production, переработка отходов, waste processing
Chemistry(all), ashstore, вторичное сырье, ash, Ash, шлаки, золошлаковые отходы, безотходные производства, slag, investment project., investment project, Chemical Engineering(all), инвестиционные проекты, waste-free production, переработка отходов, waste processing
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 20 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
