During power system restoration, the maximum load amount that a substation can pick up at one time is a critical parameter to be determined. Many factors should be considered, such as frequency constraint, transient voltage-dip constraint, steady-state voltage constraint and cold load pickup. This paper proposes a mathematical model for calculating the maximum restorable load amount, in which proper checking methods are presented to deal with these constraints. Frequency deviation is calculated by the average system frequency model. The transient voltage-dip constraint is dealt with by a fast estimation. Cold load pickup characteristics are addressed according to a simple guideline. And a modified bisection algorithm is proposed to solve the complex problem efficiently. The effectiveness is demonstrated by case studies performed on the IEEE 14-bus system and a practical power system.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 45 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |