
Abstract In this paper, a mixed integer quadratically constrained program to solve the unit commitment problem is presented. It is the most complete model found in the literature until now and it can be used to solve real-life, large-scale power systems. The model considers thermal conventional plants, independent power producers, interruptible loads, and a simplified representation of combined cycle plants and hybrid combined cycle plants using the aggregated model. The objective function includes variable generation costs and fixed start-up costs. Important constraints like spinning reserve, power flows in tie-lines, and quadratic fuel consumption constraints are included, among others. Also, the status of every single unit is considered; if the unit is available, if the unit can be committed, and if the unit can be dispatched. The model is implemented in Intel (R) Fortran 11.0 and solved using the commercial optimization software IBM CPLEX 12.1. To prove the usefulness of the formulation, a real life power system is solved for a twenty-four hour planning horizon based on the nodal representation of the Mexican Power System.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 33 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |
