Downloads provided by UsageCounts
Under practical operation, electric locomotive traction units of series PE2U quite often require, especially in recent decades, various kinds of repair, necessitating the restoration of fleet of these machines that are rather worn-out. That changes the most important indicator in the work of the machine ‒ the distribution of masses; the resulting imbalance of the machine can reach 30 %. Further operation of such a locomotive leads to a decrease in its traction by 40‒100 kN, shortens the service life of the undercarriage by 8‒10 years on average, as well as requires that the speed of the machine during operation should be reduced by 10‒15 km/h. Given the lack of an appropriate regulatory framework and of recommendations in the specialized literature, such balancing operations are actually performed iteratively, with an arbitrary arrangement of ballast elements, which often delays the duration of operations and leads to their poor quality. One of the possible solutions to resolve this issue is the development and implementation of a special theoretical method that would make it possible to analytically substantiate the proposed structural-technological solutions related to the arrangement of a ballast at the electric locomotive traction unit PE2U. In this case, the ballast is composed of individual small-size elements that are stacked in rows into existing structural cavities in a bearing frame. The result is a compiled so-called individual ballast map for each machine. The proposed approach includes two stages of calculations and makes it possible to not only obtain practically acceptable ballast location diagrams, but to also significantly reduce the number of weighings required for the machine. The approach has been tested on several machines at electric locomotive traction units of PE2U over 2010‒2012 and could be officially used in the specialized regulatory documentation. Its practical error does not exceed 3 % and is mainly predetermined by technological factors
UDC 621.33, локомотив; электровоз; тяговый агрегат ПЭ2У; балансировка машины; балластная карта, locomotive; electric locomotive; traction unit PE2U; machine balancing; ballast map, локомотив; електровоз; тяговий агрегат ПЕ2У; балансування машини; баластна карта
UDC 621.33, локомотив; электровоз; тяговый агрегат ПЭ2У; балансировка машины; балластная карта, locomotive; electric locomotive; traction unit PE2U; machine balancing; ballast map, локомотив; електровоз; тяговий агрегат ПЕ2У; балансування машини; баластна карта
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 3 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
| views | 3 | |
| downloads | 4 |

Views provided by UsageCounts
Downloads provided by UsageCounts