This article deals with the issue of function regulation of customer’s plants that burn traditional types of fuel. Its aim was to develop certain measures for reducing customer’s plants influence on the Belarusian power supply system as their activity has unfavorable economic consequences. The following methods were used in the present research: the system analysis, the method of analogies and expenses calculation. The article presents the comparative characteristics of the power production during the typical working day of the heating period in the years 2013 and 2014 in terms of condensation power plants, central heating and power plants and customer’s plants. The potential damage caused by the customer’s plants to the power supply system has been calculated, the restrictions for the customer’s plants activity existing in the Republic of Belarus nowadays has been analyzed. The author has developed a number of measures within the framework of regulation policy of the activity of customer’s plants that burn traditional types of fuel: the fee for the spinning reserve necessary for the power supply system in case of the customer’s plants breakdown; the fee for the supervisory control; the fee for the service of transfer and distribution. The introduction of the proposed measures is supposed to bring the following advantages: high-quality growth of energy efficiency of the power industry; prime cost reduction of power energy in the power supply system as a whole; stimulation of market elements implementation in the power industry; the ability to react fairly fast to the alterations of economic conditions.
fuel overconsumption, power-and-heating plant, fee for transmission and distribution, Hydraulic engineering, Engineering (General). Civil engineering (General), installed power, fee for dispatching, fee for hot spare, customer’s plant, electric power dispensing, load curve, belarusian power supply system, TA1-2040, TC1-978, condensing power plant
fuel overconsumption, power-and-heating plant, fee for transmission and distribution, Hydraulic engineering, Engineering (General). Civil engineering (General), installed power, fee for dispatching, fee for hot spare, customer’s plant, electric power dispensing, load curve, belarusian power supply system, TA1-2040, TC1-978, condensing power plant
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 1 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |