Downloads provided by UsageCounts
Highlights: ��� Real-Time Control can enhance a rainwater tank's ability to mitigate flooding and restore baseflow. ��� Using 7-day lead-time rainfall forecast further increases the ability of RTC to reduce flooding risk. ��� Using 7-day rainfall forecast allows the controlled release to mimic reference streamflow regime.
real-time control, rainwater harvesting, forecast, stormwater, flooding, [SPI.GCIV] Engineering Sciences [physics]/Civil Engineering
real-time control, rainwater harvesting, forecast, stormwater, flooding, [SPI.GCIV] Engineering Sciences [physics]/Civil Engineering
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
| views | 3 | |
| downloads | 5 |

Views provided by UsageCounts
Downloads provided by UsageCounts