Downloads provided by UsageCounts
Data files for performing FCR second test Testing protocol as described in annex B of QualyGridS publication "Finalized testing protocol" DOI: https://doi.org/10.5281/zenodo.3912063. Based on real grid Frequency profile from Fingrid. Files FCR_Secondtest_Frequency_... contain the grid frequency input for the test with each line a frequency value in 0.1 second steps, total duration 4 hours. File FCR_secondtest:Power… contain the power vs. time profile derived from the grid frequency profile for a range of 0-100% with 0% being the lowest power to be used in the test and 100% the highest power. The file contain the power percentage with each line a percentage value in 0.1 second steps, total duration 4 hours. Further explanations in QualyGridS publication "Finalized testing protocol" https://doi.org/10.5281/zenodo.3912063
testing protocols, grid service, electrolyser
testing protocols, grid service, electrolyser
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
| views | 11 | |
| downloads | 3 |

Views provided by UsageCounts
Downloads provided by UsageCounts