Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ ZENODOarrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
ZENODO
Article . 2016
License: CC BY
Data sources: Datacite
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
ZENODO
Article . 2016
License: CC BY
Data sources: ZENODO
addClaim

Application Of Critical Chain Project Management To Construction Projects: A Review

Authors: Arti Bhan*, Asst.Prof. Ashish Waghmare;

Application Of Critical Chain Project Management To Construction Projects: A Review

Abstract

The three constraints of any project are Time, Cost & Scope that affect the quality of project & are interrelated to each other. In today’s competitive environments it is very important to complete the project with the least possible time. So, it is very important for project managers to plan & schedule the project effectively such as to achieve their targets on time. One of the traditional methods used worldwide is Critical Path Method (CPM) which leads to ineffective scheduling. In CPM, the task estimates are based on guess work which leads to increase in the project completion duration. Also the availability of resources is not considered by the scheduler to develop optimal schedules. To overcome the shortcomings of CPM, a new project management methodology called “Critical Chain Project Management” (CCPM) was developed in 1990’s by Dr. Eliyahu M. Goldratt after which various additions were given by different researcher to his research. CCPM is based on the philosophy of “Theory of Constraints” (TOC) which believes that every system has a constraint & without eliminating this constraint the system cannot progress. CCPM achieves its goal through buffer management. The developing countries like India mostly face the problems of project delays so CCPM can be applied to save the projects from time and cost overruns. This paper aims at presenting the current status and past studies in the area of CCPM.

Keywords

CCPM, TOC, Buffer Management, fever chart

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
    OpenAIRE UsageCounts
    Usage byUsageCounts
    visibility views 2
    download downloads 2
  • 2
    views
    2
    downloads
    Powered byOpenAIRE UsageCounts
Powered by OpenAIRE graph
Found an issue? Give us feedback
visibility
download
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
views
OpenAIRE UsageCountsViews provided by UsageCounts
downloads
OpenAIRE UsageCountsDownloads provided by UsageCounts
0
Average
Average
Average
2
2
Green