Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ ZENODOarrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
ZENODO
Other ORP type . 2026
License: CC BY
Data sources: ZENODO
ZENODO
Other ORP type . 2026
License: CC BY
Data sources: Datacite
ZENODO
Other ORP type . 2026
License: CC BY
Data sources: Datacite
versions View all 2 versions
addClaim

BIM-Based Prefab Element Tracking - Lagemaat Demonstration - Three Pager

Authors: DEMO Consultants;

BIM-Based Prefab Element Tracking - Lagemaat Demonstration - Three Pager

Abstract

The project's innovation was implemented in the CCN project through testing of the Reincarnate application in a real construction and refurbishment environment. The system combined BIM-based validation, QR-code interaction, and on-site testing. The application integrates IFC-based BIM data, QR codes, and linked project documentation. While BIM geometry was generally complete, important attributes and unique element IDs were often missing, limiting reliable QR–BIM linkage. Existing QR codes were successfully used for element identification, and the BIM viewer enabled accurate object selection. The implementation supports CP-IM integration by linking physical construction processes with structured digital information flows. Key challenges included incomplete IFC data, missing element IDs, unreliable QR scanning, limited BIM navigation, and UI usabilityconstraints. The results show that QR–BIM integration is feasible, but further improvements in data standardization, system integration, and usability are needed. As development follows an agile and iterative approach, the current results represent an initial stage of the project.

Keywords

BIM-based validation, Construction waste, Demolition waste, Built Environment

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average