
The simulated environment is part of the tunnel system in the Zentrum am Berg (ZaB), located within the terraced mining area of Erzberg, near Eisenerz in Austria. The ZaB facility offers a total length of 4 km of tunnels and mining galleries for testing and training. Our proposed tunnel model covers 1.5 km of it and comprises 2 parallel highway tunnels and 2 parallel railway tunnels, interconnected by cross passages and galleries. The tunnels are around 8 (railway) or 10 meters (highway) wide and 7 meters high with flat terrain and slight curvature. Unlike the mining tunnels in the SubT-Tunnel dataset, characterized by abundant planar and edge features, ZaB is a traffic tunnel system with a highly simplified architectural structure, lacking distinguished construction elements such as platforms or columns. It inherently exhibits large-scale homogeneous characteristics. Quick start • Install Gazebo Ignition • Download the ZaB-Model folder • Get into the /ZaB_Model/models/ folder • Start the simulaiton with the command: ign gazebo -v 4 -r zab_vehicle.sdf
Mesh, LiDAR, ROS/ROS2, Tunnel, Gazebo, SubT, 3DModel, SLAM, Robotics, Simulation
Mesh, LiDAR, ROS/ROS2, Tunnel, Gazebo, SubT, 3DModel, SLAM, Robotics, Simulation
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
