
This document is related to implementation of Task 4.2 ‘Micro-beam upgrade at RBI Accelerator Facility’. The aim is to upgrade the two existing ion micro-beam stations by providing a precise motorized positioning system with the beam current control and Device Under Test (DUT) position monitor, as well as to demonstrate the sample cooling option for the ‘old’ micro-beam station. These upgrades require the necessity for remote control of the various parameters, such as the sample illumination and positioning in front of the ion beam, the ion beam focusing and current control, leading to the development of an integrated control system, using the home made SPECTOR DAQ and Experimental Physics and Industrial Control System (EPICS) which enables not only the fine setting of various options at the end-station but in addition, also the parallel control of accelerator parameters and logging.
WP4
WP4
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
