Abstract Settlement is one of the most important deformation characteristics of a high concrete-face rockfill dam (CFRD) and is regarded as a key indicator of dam safety. The time-dependent settlement behavior of the Shuibuya CFRD is studied on the basis of in situ settlement-monitoring records and displacement back-analysis. The goal of this work is to characterize actual deformation of the dam and to verify the back-analysis method used in this paper. The settlement-monitoring records were from seven control stations at the crest and 38 monitoring points inside the body of the dam and covered the construction period, the initial filling of the reservoir and 2 years of operation. A displacement back-analysis for parameters is performed by hybrid generic algorithms (HGAs) and finite element method (FEM). Comparative studies of monitoring data and back-analysis show good agreement between measured settlements and computed settlements. Furthermore, the deformation in the next 3 years is predicted on the basis of back-analysis. Overall, it is demonstrated that the deformation of the Shuibuya CFRD is basically stable and that the technique used to control the dam deformation is successful.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 152 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 1% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 1% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |