Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ SOLAarrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
SOLA
Article
Data sources: JAIRO
addClaim

Predictability of Heavy Snowfall Days in Western Hokkaido from JMA Operational 1-Month Ensemble Predictions Using Self-Organizing Maps

Predictability of Heavy Snowfall Days in Western Hokkaido from JMA Operational 1-Month Ensemble Predictions Using Self-Organizing Maps

Abstract

We investigated the sub-seasonal predictability of heavy snowfall events in Iwamizawa, Hokkaido, using the Japan Meteorological Agency's 1-month ensemble predictions. First, the self-organizing map (SOM) technique was applied to the Japanese 55-year Reanalysis sea-level pressure anomalies to identify weather patterns resulting in heavy snowfall. It revealed that heavy snowfall developed in SOM nodes (weather patterns) with low-pressure centers to the east/northeast of Hokkaido and Siberian high to the west, resulting in westerly to northwesterly monsoon winds traversing the Sea of Japan towards western Hokkaido. Next, ensemble forecasts were projected onto the SOM map to determine the predictability of weather patterns up to a month in advance. For winter 2019, there was relatively low probability of projecting a high number of ensembles in SOM nodes to those observed in the reanalysis. In contrast, much higher probability was seen in 2020 to similar to 10 forecast days. When considering multiple SOM nodes that contribute to heavy snowfall in the forecast, both winters saw more ensemble members predicting heavy snowfall to similar to 10 forecast days. We also saw a higher probability of heavy snowfall beyond 10-days in 2020. These results highlight the potential benefit of incorporating multiple weather patterns to forecast heavy snowfall.

  • BIP!
    Impact byBIP!
    citations
    The total number of citations received by all articles of the researcher of interest.
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
citations
The total number of citations received by all articles of the researcher of interest.
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
gold