
handle: 11336/13362 , 11336/12937
The management of oil-product pipelines represents a critical task in the daily operation of petroleum supply chains. Efficient computational tools are needed to perform this activity in a reliable and cost-effective manner. This work presents a novel discrete event simulation system developed on Arena® for the detailed scheduling of a multiproduct pipeline consisting of a sequence of pipes that connect a single input station to several receiving terminals. The pipeline is modeled as a non-traditional multi-server queuing system involving a number of servers at every pipe-end that perform their tasks in a synchronized manner. Based on priority rules, the model decides which server should dispatch the entity waiting for service to the associated depot. Each priority rule can lead to a different delivery schedule, which is evaluated by using several criteria. Combined with optimization tools, the proposed simulation technique permits to easily manage real-world pipelines operations with low computational effort.
Fil: Mendez, Carlos Alberto. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico Para la Industria Química (i); Argentina. Universidad Nacional del Litoral; Argentina
Fil: Cafaro, Diego Carlos. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico Para la Industria Química (i); Argentina. Universidad Nacional del Litoral; Argentina
Fil: Cafaro, Vanina. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico Para la Industria Química (i); Argentina. Universidad Nacional del Litoral; Argentina
Fil: Cerda, Jaime. Consejo Nacional de Investigaciones Científicas y Técnicas. Centro Científico Tecnológico Santa Fe. Instituto de Desarrollo Tecnológico Para la Industria Química (i); Argentina. Universidad Nacional del Litoral; Argentina
Discrete-Event Simulation, Priority Rules, https://purl.org/becyt/ford/2.4, Oil-Product Pipelines, Multiproduct Pipeline, https://purl.org/becyt/ford/2, Optimization Tools, Short-Term Scheduling
Discrete-Event Simulation, Priority Rules, https://purl.org/becyt/ford/2.4, Oil-Product Pipelines, Multiproduct Pipeline, https://purl.org/becyt/ford/2, Optimization Tools, Short-Term Scheduling
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
