Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ Norwegian Open Resea...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
NTNU Open
Master thesis . 2015
Data sources: NTNU Open
versions View all 2 versions
addClaim

New Concept for Durable Concrete Bridges

Authors: Damek, Marek;

New Concept for Durable Concrete Bridges

Abstract

This master s thesis covers the design of a post-tensioned concrete bridge in Trondheim municipality in Norway, in collaboration with Statens vegvesen (SVV). The concept of the bridge is inspired by Egg-Graben-Brücke in Austria, which was designed and built without steel reinforcement in the bridge deck. The total length of the bridge is 73 meters and it is divided into 3 spans. The cross-section of the bridge is assumed as a massive T-beam/slab with flanges. The width of the cross-section with edge beams is 9,5 meters and the height is 1,3 meters. The bridge is planned to be built in 4 stages and a proposed building process is presented. The bridge is post-tensioned in longitudinal and transverse direction. Due to the high maintenance costs of bridges, the bridge is designed to use as little steel reinforcement as possible to enhance the durability. The number of prestressing tendons have been determined. The design is according to established standards such as Eurocodes, and Handbook N400 by Statens vegvesen. Analytical models have been created in the program NovaFrame for longitudinal direction and some parts in the program Scia Engineer for transverse direction. The master s thesis contains analyses for ultimate limit state and serviceability limit state for critical sections. The capacities and requirements are sufficient in the controlled sections for both limit states.

Country
Norway
Keywords

Bygg- og miljøteknikk (2-årig), Prosjektering av konstruksjoner

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
Green