Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ Repositorio Document...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Repositorio Documental UMNG
Bachelor thesis . 2020
License: CC BY NC ND
versions View all 1 versions
addClaim

PMBOK, gerencia de proyectos y buenas prácticas

Authors: Castillo Amaya, Andrés David;

PMBOK, gerencia de proyectos y buenas prácticas

Abstract

El PMI con su guía base nombrada el PMBOK, contempla una serie de procesos para estandarizar las buenas prácticas en el momento de dirigir un proyecto. En este ensayo se compara y analiza el Costo de la Calidad con los problemas sucedidos a lo largo del desarrollo del proyecto del Túnel de la Línea en la cordillera central colombiana y sus posibles beneficios de haber considerado dicho costo para sus procesos administrativos.

The PMI with its base guide named the PMBOK, contemplates a series of processes to standardize good practices when directing a project. This essay compares and analyzes the Cost of Quality with the problems that happened throughout the development of the Tunnel de la Línea project in the Colombian central mountain range and its possible benefits of having considered this cost for its administrative processes.

Pregrado

Country
Colombia
Related Organizations
Keywords

PMBOK, Tunnel, Cost, Prevention, Infraestructure, Costo, Quality, Infraestructura, Tunel, Socioeconomic, Prevención, Desaciertos, MIstake, ADMINISTRACION DE PROYECTOS, Socio-económico, PLANIFICACION ESTRATEGICA, Calidad

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
Green