
handle: 10356/6718
The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The station excavation is 18m to 29m deep, and NEL tunnels are constructed approximately llm below the operational tunnels. Majority of the excavation is carried out in predominantly highly and moderately weathered sedimentary rocks of the Jurong Formation.
Master of Science (International Construction Management)
DRNTU::Engineering::Civil engineering::Geotechnical
DRNTU::Engineering::Civil engineering::Geotechnical
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
