Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ Journal Dynamic Sain...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Journal Dynamic Saint
Article . 2018 . Peer-reviewed
Data sources: Crossref
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Journal Dynamic Saint
Article
License: CC BY
Data sources: UnpayWall
versions View all 1 versions
addClaim

Optimasi Percepatan Durasi Proyek Pembangunan Gedung

Authors: Parea Rusan Rangan;

Optimasi Percepatan Durasi Proyek Pembangunan Gedung

Abstract

Pada suatu proyek konstruksi jadwal dan rencana kerja merupakan hal yang penting. Dalam suatu proyek konstruksi hampir selalu terjadi perubahan rencana dari yang telah ditetapkan semula, dimana perubahan rencana tersebut bisa terjadi sebelum proyek dimulai ataupun pada saat proyek sedang berlangsung. Pada studi kasus dibahas Proyek Pembangunan Gedung Olahraga di kota Rantepao, dengan Biaya Proyek sebesar Rp Rp1.188.195.378 dan masa pelaksanaan proyek selama 210 hari kerja. Hasil analisa menggunakan metode Least Cost Analysis, penyelesaian proyek tercepat yang dapat diterapkan untuk menyelesaikan proyek pembangunan gedung olahraga di kota Rantepao dengan penambahan jam kerja adalah 199 hari, 11 hari lebih cepat dari waktu penyelesaian rencana awal, dengan pengurangan biaya total proyek sebesar Rp. 50.728.327,00, sedangkan dengan menggunakan metode penambahan tenaga kerja adalah mempercepat proyek 188 hari, 22 hari lebih cepat dari waktu penyelesaian rencana awal, dengan pengurangan biaya total proyek sebesar Rp. 50.736.720,00 dan dengan menggunakan metode penambahan peralatan mempercepat proyek 195 hari, 15 hari lebih cepat dari waktu penyelesaian rencana awal, dengan pengurangan biaya total proyek sebesar Rp. 52.064.076,00.

Related Organizations
  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
gold