Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ Asian Journal of Eng...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
Asian Journal of Engineering Social and Health
Article . 2025 . Peer-reviewed
License: CC BY SA
Data sources: Crossref
addClaim

Analysis of Cost and Schedule Variances Using Earned Value Method on Waru - Buduran Frontage Road Bridge Construction Project

Authors: Suparno Suparno; Hanie Teki Tjendani; Budi Witjaksana;

Analysis of Cost and Schedule Variances Using Earned Value Method on Waru - Buduran Frontage Road Bridge Construction Project

Abstract

Infrastructure development is an important element in supporting economic growth, including in Indonesia. The Waru - Buduran Frontage Road Bridge development project was designed to overcome traffic congestion in the Sidoarjo area as a buffer zone for Surabaya. However, the project faced various obstacles, including schedule deviations and significant costs. This research aims to analyze the project's cost and schedule performance using the Earned Value Analysis method, focusing on Schedule Variance and Cost Variance to identify the main causes of delays and cost inefficiencies and provide recommendations for improvement. The research method used was a descriptive quantitative approach, with data collection through documentation of project financial reports, weekly schedules, and interviews with project managers. The analysis was carried out by calculating EVA indicators, such as Planned Value, Earned Value, and Actual Cost, to evaluate the cost efficiency and timeliness of the project. The results showed that the project experienced a negative schedule deviation of -9.911% in the 14th week, caused by technical constraints in utility relocation and coordination between stakeholders. However, the project still showed cost efficiency with a positive Cost Variance of 3.8%, indicating that actual costs were lower than the planned budget. The implications of this research highlight the need for more effective schedule planning, improved project coordination, and the implementation of acceleration strategies to reduce the impact of delays. In addition, the integration between schedule and cost management must be improved so that cost efficiency does not compromise the continuity of the project schedule.

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
hybrid