Sapinhoÿ Field, Santos Basin Pre-Salt: From Conceptual Design to Project Execution and Results

Authors: J. Turazzi Naveiro; D. Haimson;

Sapinhoÿ Field, Santos Basin Pre-Salt: From Conceptual Design to Project Execution and Results

Abstract

This article presents how the development of Sapinhoá field took place, covering the fast track transition and decision making process from appraisal phase to conceptual and basic engineering of Sapinhoá Pilot project, and its subsequent execution, highlighting the challenges, lessons learned and results obtained. Located in Santos basin pre-salt cluster, 300 km off the coast of SÃo Paulo state, Sapinhoá field was discovered in June/2008, and quickly entered an evaluation program, which included appraisal wells, one extended well test and one early production system, performed by Petrobras (Operator) and its partners BG E&P Brasil and Repsol Sinopec Brasil. Even though at the time a number of uncertainties to develop pre-salt areas was still present, such as reservoir heterogeneity, recovery method, fluid properties (including CO2 distribution along the reservoir), well construction technologies, riser qualification, among others, a fast track strategy was chosen. Therefore the implementation of a Pilot project was seen as a mean to provide valuable information for the remaining development of Sapinhoá and other fields in the pre-salt cluster. In order to cope with these challenges, Petrobras and its partners chartered the FPSO Cidade de SÃo Paulo, with 120,000 bpd oil capacity and specifications capable to comply with different recoverable methods and produced fluids. Also, for the subsea system, a new riser concept was selected through a design competition process, the so called "SCR on BSR" (Steel Catenary Risers - SCR on Buoy Supporting Risers - BSR), with two large structures positioned approximately 250 meters below the sea surface, supporting from 22 to 28 of a mix of rigid and flexible risers and umbilicals. Sapinhoá Pilot started its wells construction campaign in 2012 and currently plans to achieve scope completion with only 85% of the approved duration, due to the implementation of a series of improvements in well’s projects. The production unit was delivered before schedule, enabling start-up in early January 2013. Full capacity was achieved in July 2014, with only four producer wells, some with potentials of up to 35 thousand bbl/d. This was achieved after the successful installation of the innovative BSR project, which faced and surpassed a series of challenges in the construction and offshore campaign phases. The paper describes the solutions adopted in all disciplines, from subsurface to topside facilities, and how uncertainties were mitigated in Sapinhoá Pilot development during engineering phases, and the challenges and lessons learned this fast-track project faced during construction and installation.

Related Organizations
  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    7
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Top 10%
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Top 10%
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
7
Top 10%
Top 10%
Average
Upload OA version
Are you the author of this publication? Upload your Open Access version to Zenodo!
It’s fast and easy, just two clicks!