
doi: 10.2523/56970-ms , 10.2118/56970-ms
Abstract British Government legislation effectively prohibits the offshore disposal of oil contaminated cuttings. By the end of 2000 this will include cuttings contaminated by synthetic / pseudo-oil based muds. In high pressure and temperature environments such as Shearwater, temperature and wellbore stability constraints restrict the use of existing silicate water based muds to tophole sections. Total containment of cuttings is therefore required. The Ship and Skip program implemented on Shearwater has demonstrated that total cuttings containment is possible even during high speed drilling of larger hole (16") sections without incurring drilling downtime. The phased nature and sound planning of the program was key to operational safety and cost.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
