
doi: 10.2495/cr160271
In the public transportation industry remarkable Big Data is formed. The data which are generated from tracking the vehicles shall be used for different kinds of purposes. The arrival time of the vehicles is one of the most desired data for the passengers. In this study, big data which is produced for tracking the vehicles at the Command Centre are used. The T1 tram line of Istanbul City is segmented into 300 parts using radio-frequency identification (RFID) sensors and each part is observed for estimation processes. Also, for computing the location accurately, odometer data of the train is gathered. Elapsed time of each train at each part of the line is inspected for the previous 2 hours. Then the average of the elapsed time of each part is calculated. To determine the remaining time of the closest trains, the location of all trains is observed. Finally, according to the distance between the trains and the station, the arrival time of a train is calculated. As test laboratory generated data for each station are displayed on a web environment. For observation of estimation accuracy, estimated times are compared with the real arrival times. As a result, ninety percent accuracy is obtained. This study will generate the data for the information display on the train platforms.
| citations The total number of citations received by all articles of the researcher of interest. | 0 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
