
Summary: We consider a very simple integer program involving production of a single item and start-up costs for the standard machines first studied by Lasdon and Terjung. Solving directly as an integer program leads to prohibitively large branch and bound trees. Here, we show how using a simple family of valid inequalities and a heuristic procedure to choose one of these inequalities as a cut, it is possible to reduce substantially the size of the tree, and in several cases to eliminate the need for branch and bound. The valid inequalities used are all simple Gomory cuts. However, they are derived from the initial problem formulation rather than from the optimal linear programming tableau.
lot-sizing, single item, Deterministic scheduling theory in operations research, heuristic procedure, machine scheduling, start-up costs, valid inequalities, Production models, polyhedral combinatorics, cutting planes
lot-sizing, single item, Deterministic scheduling theory in operations research, heuristic procedure, machine scheduling, start-up costs, valid inequalities, Production models, polyhedral combinatorics, cutting planes
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 7 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
