
Selective maintenance is often applied in many industrial environments where maintenance is performed between sequence missions. When the length of maintenance or work mission time is stochastic, previous research based on deterministic mission times is unsuitable. Assume that the time of work mission is random and maintenance time is determined in a two-state and parallel system, to maximise system reliability of next work mission in this paper a stochastic model is proposed under the maintenance time limit. The optimal maintenance plan is obtained with a hybrid intelligent optimisation algorithm. A simulation was performed to verify the validity and feasibility of the proposed model.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 9 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |
