
doi: 10.14359/12838
Short- and medium-span bridges commonly use prestressed concrete (PSC) I-type girders in their construction. Prestressing in traditional PSC girders is usually applied once at the beginning stage of fabrication. The magnitude of the prestressing force is limited within allowable stresses at various construction stages. Consequently, for longer spans, a larger sectional depth is required. To achieve more economical PSC girders in terms of a reduced girder depth for a given span, or a longer span for a given girder depth, the method of multistage prestressing at different loading stages is introduced. Theoretical expressions for stresses at each loading stage are developed and experimental verification is carried out by 2 full-scale flexural tests. From parametric studies and test results, it was observed that the developed girders satisfied the requirements for the strength and ductility, and can be an economical alternative to other types of PSC girders for long-span bridges.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 7 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
