
doi: 10.1115/1.2899608
Efficient lumber utilization at the saw has become a key issue in the woodworking industry. This is because of shrinking supply and increasing raw materials prices. In this paper, formulation of the cross-cut first method of cutting defects out of lumber as a one-dimensional stock cutting problem is discussed. A Monte-Carlo simulation method has been used for generating boards of a given grade. This simulation greatly aids in comparing alternate solution procedures proposed in the paper. To facilitate real time-application, a fast heuristic for the digital computer is introduced. This is followed by a discussion of cutting length priority allocation. The heuristic solution is compared with the optimal solution obtained using Kolesar’s knapsack algorithm.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 5 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
