Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system operation. The effect of each candidate switching operation or setpoint change is evaluated mainly in terms of restored load and the predicted steady state voltage and frequency. Application to the CIGRE NORDIC32 test system shows that operation is fully restored from complete blackout after about 750 actions including network switching and gradual connection of system loads. The main applications of the methodology are off-line use for surveying new restoration strategies and on-line use for suggesting the next action to the operator.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 2 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |