
One of the recurring problems facing energy control center dispatchers each day is how to operate the system during the periods of high load pickup, such that there is sufflcient generation to follow the load pickup, while still maintaining reasonable reserve and/or regulation margin. This paper shows a technical solution to this problem which can be achieved with a very efficient use of computer resources. The problem is expressed as a dynamic programming scheduling problem, and a feasible, but suboptimal solution is proposed, which eliminates the usual search space problem. This method reduces the problem to a backward sequence of dispatch problems, with the generator limits being carefully adjusted between each time interval in the solution sequence. The paper also discusses an efficient algorithm for the solution of a reserve constrained economic dispatch, which is the static optimization technique used at each interval.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 99 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 1% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
