
The problem of stochastic deadline scheduling is considered. A constrained Markov decision process model is introduced in which jobs arrive randomly at a service center with stochastic job sizes, rewards, and completion deadlines. The service provider faces random processing costs, convex non-completion penalties, and a capacity constraint that limits the simultaneous processing of jobs. Formulated as a restless multi-armed bandit problem, the stochastic deadline scheduling problem is shown to be indexable. A closed-form expression of the Whittle's index is obtained for the case when the processing costs are constant. An upper bound on the gap-to-optimality for the Whittle's index policy is obtained, and it is shown that the bound converges to zero as the job arrival rate and the number of available processors increase simultaneously to infinity.
arXiv admin note: text overlap with arXiv:1605.07578
Optimization and Control (math.OC), FOS: Mathematics, Mathematics - Optimization and Control
Optimization and Control (math.OC), FOS: Mathematics, Mathematics - Optimization and Control
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 33 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Top 10% | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Top 10% | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Top 10% |
