
doi: 10.1007/bf02707062
In the present study a reliable and structural decision system for production sequence of polymeric products is developed. Minimization of the amount of off-specs is the main objective in the decision of production sequence to maximize profit. Off-specs are generated when the production sequence of polymeric products is changed. The amount of off-specs depends on changes of product grades. In the present study we applied the traveling salesman problem (TSP) to achieve optimal decision of production sequence. To solve the optimal decision problem formulated by TSP, we employed three different approaches such as Branch and Bound (B&B) method, Dynamic Programming (DP) method and Hopfield Neural Network (HNN) method. Production sequences computed based on the actual plant off-spec data were compared with the sequences employed in the actual plant operation. From the comparison the decision method proposed in the present study showed increased profits and reduced off-specs.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 4 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
