Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Closed Access logo, derived from PLoS Open Access logo. This version with transparent background. http://commons.wikimedia.org/wiki/File:Closed_Access_logo_transparent.svg Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Systems Engineeringarrow_drop_down
image/svg+xml Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Closed Access logo, derived from PLoS Open Access logo. This version with transparent background. http://commons.wikimedia.org/wiki/File:Closed_Access_logo_transparent.svg Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao
Systems Engineering
Article . 2016 . Peer-reviewed
License: Wiley Online Library User Agreement
Data sources: Crossref
DBLP
Article . 2016
Data sources: DBLP
versions View all 2 versions
addClaim

A Methodology for Affordability Maturity Assessment

Authors: Long Dong; Jerrell T. Stracener;

A Methodology for Affordability Maturity Assessment

Abstract

Abstract Systems are becoming more complex while engineering of these systems is facing challenges in cost reduction and shortened schedules due to the fact that technologies emerge and quickly became obsolete. “Do more for less” is a new reality for the U.S. defense industry. As a result, large defense corporations have shifted their cost control effort from business to project management and systems engineering organizations. The realization of affordability in major weapon systems development programs may not be at a tipping point; however, the biggest customer of these weapon developers, that is, the U.S. Department of Defense (DoD), will drive affordability through contract estimation and performance on a firm fixed contract method. This becomes game changing in the defense contract industry, which will drive affordability from offices and manufacturing floors to supplier warehouses. For every complex system development program, the cost to design such system is estimated or predicted before the systems development and demonstration contract is awarded. The transformation of the estimated cost figure is evolving as systems engineering efforts taking place throughout the design life cycle. Thus, without understanding the cost figures during this time, the evolution of cost overrun is inevitable. This paper describes a method to assess the affordability maturity level associated with the systems engineering tasks defined by ISO/IEC 15288 and the Defense Acquisition Strategy, DODI 5000.02. The paper focuses on developing a methodology to insert and assess the maturity of systems engineering efforts and the integration of performance and cost measurement from concept definition through systems design and development. The method is called affordability maturity assessment methodology.

Related Organizations
  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    1
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
1
Average
Average
Average
Upload OA version
Are you the author of this publication? Upload your Open Access version to Zenodo!
It’s fast and easy, just two clicks!