Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/ The Eurasia Proceedi...arrow_drop_down
image/svg+xml art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos Open Access logo, converted into svg, designed by PLoS. This version with transparent background. http://commons.wikimedia.org/wiki/File:Open_Access_logo_PLoS_white.svg art designer at PLoS, modified by Wikipedia users Nina, Beao, JakobVoss, and AnonMoos http://www.plos.org/
versions View all 2 versions
addClaim

This Research product is the result of merged Research products in OpenAIRE.

You have already added 0 works in your ORCID record related to the merged Research product.

Parallel Machine Scheduling with Re-entrant Jobs with Consideration of Set up Times

Authors: Kayisoglu, Betul; Bekli, Seyma; Sahin, Ayse Sena; Akyurek, Gamze Gul; Aydinli, Ruveyda; Copur, Sevda Nur; Ekinci, Tugba;

Parallel Machine Scheduling with Re-entrant Jobs with Consideration of Set up Times

Abstract

We study the identical parallel machine problem with re-entrant jobs. Re-entrant jobs require to pass through the processing line multiple times. In many real-life manufacturing systems with parallel machine environments, one of the scheduling problems that needs to be addressed is the order of jobs on each machine with re-entrant jobs. In addition, manufacturing systems may require periodic maintenance, systematic manufacturing equipment cleaning, or predetermined upper limits on the overtime. Therefore, machine availability may vary during the scheduling horizon. We propose an integer programming model to find the optimal sequence of the re-entrant jobs at parallel machines with consideration of machine availability. The model aims to reduce setup times and maximize capacity utilization by scheduling tasks with similar set up requirements consecutively. We tested the proposed model at a panel line manufacturing company located in Turkey. The order of the panels is scheduled optimally by the proposed model for 3 different instances on the identical parallel machines for the coating process. We also provided relevant information on the user interface we developed to make the proposed scheduling model usable to by the company. The proposed model and interphase offer a systematic approach to panel line planning and can also be implemented in other industries.

Related Organizations
Keywords

İstatistik (Diğer), Production scheduling;Re-entrant scheduling;Parallel machine scheduling;Sustainablemanufacturing;Integer programming model., Statistics (Other)

  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    0
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Average
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Average
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
0
Average
Average
Average
gold