Powered by OpenAIRE graph
Found an issue? Give us feedback
image/svg+xml Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Closed Access logo, derived from PLoS Open Access logo. This version with transparent background. http://commons.wikimedia.org/wiki/File:Closed_Access_logo_transparent.svg Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Arabian Journal for ...arrow_drop_down
image/svg+xml Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao Closed Access logo, derived from PLoS Open Access logo. This version with transparent background. http://commons.wikimedia.org/wiki/File:Closed_Access_logo_transparent.svg Jakob Voss, based on art designer at PLoS, modified by Wikipedia users Nina and Beao
Arabian Journal for Science and Engineering
Article . 2020 . Peer-reviewed
License: Springer TDM
Data sources: Crossref
versions View all 1 versions
addClaim

This Research product is the result of merged Research products in OpenAIRE.

You have already added 0 works in your ORCID record related to the merged Research product.

A Fuzzy Multi-objective Mathematical Programming Model for Project Management Decisions Considering Quality and Contractual Reward and Penalty Costs in a Project Network

Authors: S. M. Hashemi; S. M. Mousavi; A. Patoghi;

A Fuzzy Multi-objective Mathematical Programming Model for Project Management Decisions Considering Quality and Contractual Reward and Penalty Costs in a Project Network

Abstract

Project management is a process that schemes and controls the project life cycle via the easiest and the best way to achieve project goals. Project managers always aim to simultaneously handle conflicting goals in the organization. In this paper, a new mathematical model is proposed that simultaneously minimizes total cost and completion time and maximizes the quality in the project management decision problem. Contractual penalty cost and contractual reward cost with a new method are the other consideration in the proposed model. In the projects, the relation between time and direct cost is a nonlinear function. Hence, a linearization technique is presented with attention to variable change and piecewise linearization, in which nonlinear function is converted to the linear programming model. On the other hand, in real conditions according to uncertainty in environmental situations and incomplete information, there can be ambiguity in parameters and variables of the problem. The uncertainty of the parameters and variables is expressed with fuzzy sets theory and fuzzy mathematical programming. The other aim of this paper is to introduce a modified version of fully fuzzy multi-objective linear programming for the problem. For analyzing a fully fuzzy time–cost–quality project management model, a practical example of the literature is provided. By examining the results of the model with conflicting objectives, two scenarios are presented to explore the interactions of conflicting objectives on the project, and the results are reported.

Related Organizations
  • BIP!
    Impact byBIP!
    selected citations
    These citations are derived from selected sources.
    This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    11
    popularity
    This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
    Top 10%
    influence
    This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
    Average
    impulse
    This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
    Top 10%
Powered by OpenAIRE graph
Found an issue? Give us feedback
selected citations
These citations are derived from selected sources.
This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Citations provided by BIP!
popularity
This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network.
BIP!Popularity provided by BIP!
influence
This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically).
BIP!Influence provided by BIP!
impulse
This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network.
BIP!Impulse provided by BIP!
11
Top 10%
Average
Top 10%
Upload OA version
Are you the author of this publication? Upload your Open Access version to Zenodo!
It’s fast and easy, just two clicks!