
This paper aims to minimize makespan for the hybrid flowshop scheduling problem. We present a novel Fruit Fly Optimization (FFO), called multi-swarm FFO, by introducing a multiple-swarm strategy and a competition-and-updating mechanism to the basic FFO. The parameters and operators for the presented MMFO algorithm are calibrated by means of a design of experiments approach. The numerical comparisons show that MFFO performs much better than several well-known metaheuristics in the literature for the considered HFS problem.
| selected citations These citations are derived from selected sources. This is an alternative to the "Influence" indicator, which also reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | 3 | |
| popularity This indicator reflects the "current" impact/attention (the "hype") of an article in the research community at large, based on the underlying citation network. | Average | |
| influence This indicator reflects the overall/total impact of an article in the research community at large, based on the underlying citation network (diachronically). | Average | |
| impulse This indicator reflects the initial momentum of an article directly after its publication, based on the underlying citation network. | Average |
